by Kurt Sundberg | Nov 30, 2022 | Electrical Control Panel, Factory Acceptance Test (FAT), Factory Acceptance Testing, Manufacturing, programmable logic controllers (PLC), PWA6000 Wire Processing Center, Quality Control, UL Certification, Wire Custom Panels, Wire ducts, Wire ducts
From Steam to PLCs In the factories of the Industrial Revolution, steam engines powered a central steel drive shaft that ran along the length of the factory and sometimes continued outside into a second building. Other shafts, connected via belts and gears, drove...
by Kurt Sundberg | Oct 20, 2021 | Electrical Control Panel, Factory Acceptance Testing, Innovation, Integrity, Manufacturing, Quality Control, UL Certification
In the manufacture of control panels nothing should be taken for granted. To build a high-quality panel the design, components, layout, wiring, labeling, and the enclosure must all be carefully planned, selected, and combined to meet exacting standards. The design and...